|
Drawing No.
|
File Size (Kilobytes)
|
Plan Insert Sheets |
Date |
|
Adobe Acrobat 4.0
(.pdf) |
Microstation
(.dgn) |
| 201015 |
66 |
287 |
Detail Plan Sheet
Extension of Anchor Bolts |
04/20/07 |
| 202010 |
92 |
74 |
Sign Mounting Details |
11/27/06 |
| 202020 |
55 |
98 |
Concrete Barrier Mounted Sign Support Detail Method A |
11/27/06 |
| 202021 |
56 |
72 |
Concrete Barrier Mounted Sign Support Detail, Method B |
11/27/06 |
| 202022 |
51 |
162 |
Concrete Barrier Mounted Sign Support Detail, Method C |
11/27/06 |
| 202030 |
41 |
112 |
Sign Support Assembly: Pole Mounted, As Per Plan |
11/27/06 |
| 202150 |
132 |
131 |
Concrete Median Barrier Overhead Sign Support Foundation
(single slope) |
11/27/06 |
| 202160 |
69 |
61 |
Split Foundations |
11/27/06 |
| 202310 |
649 |
51 |
Protective Coating Of Overhead Sign Support Sections |
11/27/06 |
| 202311 |
189 |
76 |
Protective Coating Of Overhead Sign Support Sections,
Method B |
11/27/06 |
| 202400 |
289 |
188 |
Dynamic Message Sign Truss Catwalk |
11/27/06 |
| 202510 |
279 |
117 |
Overhead Sign Support Type TC-10.48 |
11/27/06 |
| 202910 |
73 |
68 |
Fixture Support Arm Repair Brackets |
11/27/06 |
| 203010 |
184 |
87 |
Generator Power Panel |
11/27/06 |
| 203020 |
127 |
92 |
Prepare To Stop When Flashing
(PTSWF) Sign Installation |
10/19/07 |
| 203030 |
212 |
73 |
Wapiti Software Timing - Master |
11/27/06 |
| 203322 |
278 |
91 |
Wapiti Software Intersection Timing 332 Cabinet |
01/19/07 |
| 203362 |
278 |
85 |
Wapiti Software Intersection Timing 336 Cabinet |
01/19/07 |
| 203410 |
154 |
114 |
Magnetometer Detector Probe Installation On Bridge |
11/27/06 |
| 206010 |
69 |
140 |
Typical Pole Entrance Fitting |
11/27/06 |
| 206011 |
43 |
54 |
Aerial Cable Placement Methods |
11/27/06 |
| 206012 |
81 |
89 |
Cable Storage Details I |
11/27/06 |
| 206013 |
78 |
92 |
Cable Storage Details II |
11/27/06 |
| 206014 |
65 |
123 |
Miscellaneous Fiber Optic Details |
11/27/06 |
| 206015 |
48 |
75 |
Typical Loose Tube Cable Installation |
11/27/06 |
| 206016 |
70 |
46 |
Cable Construction |
11/27/06 |
| 207510 |
380 |
83 |
Web Cameras |
11/27/06 |
| 207520 |
66 |
49 |
Solar Powered Traffic Cameras |
11/27/06 |
| 207560 |
70 |
71 |
Radio Interconnect
Details |
11/27/06 |
| 207610 |
286 |
141 |
Ramp Meter Installation |
11/27/06 |
| 208350 |
126 |
109 |
Diamond Interchange
3-Phase Operation |
07/18/08 |
| 208351 |
136 |
71 |
Diamond Interchange
4-Phase Operation |
07/18/08 |
| 209572 |
681 |
247 |
Median Crossover of
Passing Lane Short Distance |
01/18/08 |
| 209573 |
758 |
296 |
Median Crossover of
Express Lane Long Distance |
01/18/08 |
| 209630 |
289 |
157 |
Signalized Closing 1 Lane Of A 2 Lane Highway With PCB
(3-Phase) |
11/27/06 |
| 209631 |
111 |
83 |
Details For Signalized Closing 1 Lane Of A 2 Lane Highway
- Side Mounted (3-Phase) |
11/27/06 |
| 209632 |
101 |
82 |
Details For Signalized Closing 1 Lane Of A 2 Lane Highway
- Overhead Mounted (3-Phase) |
11/27/06 |
| 209633 |
171 |
133 |
Pre-timed Wiring Diagram For Signalized Closing 1 Lane Of
A 2 Lane Highway (3-Phased) |
04/20/07 |
| 209634 |
204 |
67 |
Actuated-Wiring Diagram For Signalized Closing 1 Lane Of A
2 Lane Highway (3-Phase) |
04/20/07 |
| 209640 |
288 |
141 |
Signalized Closing 1 Lane Of A 2 Lane Highway With PCB
(4-Phase) |
11/27/06 |
| 209641 |
117 |
85 |
Details For Signalized Closing 1 Lane Of A 2 Lane Highway
Side Mounted (4-Phase) |
11/27/06 |
| 209642 |
109 |
87 |
Details For Signalized Closing 1 Lane Of A 2 Lane
Highway-Overhead Mounted (4-Phase) |
11/27/06 |
| 209643 |
215 |
65 |
Pre-timed Wiring Diagram For Signalized Closing 1 Lane Of
A 2 Lane Highway (4-Phase) |
11/27/06 |
| 209644 |
219 |
92 |
Actuated-Wiring Diagram For Signalized Closing 1 Lane Of A
2 Lane Highway (4-Phase) |
11/27/06 |
| 209650 |
298 |
172 |
Signalized Closing 1 Lane Of A 2 Lane Highway With PCB
(5-Phase) |
11/27/06 |
| 209651 |
120 |
107 |
Details For Signalized Closing 1 Lane Of A 2 Lane Highway
Side Mounted (5-Phase) |
11/27/06 |
| 209652 |
113 |
111 |
Details For Signalized Closing 1 Lane Of A 2 Lane
Highway-Overhead Mounted (5-Phase) |
11/27/06 |
| 209653 |
228 |
104 |
Pre-timed Wiring Diagram For Signalized Closing 1 Lane Of
A 2 Lane Highway (5-Phase) |
11/27/06 |
| 209654 |
231 |
104 |
Actuated-Wiring Diagram For Signalized Closing 1 Lane Of A
2 Lane Highway (5-Phase) |
11/27/06 |
| 209930 |
218 |
67 |
Work Zone Delineation on Asphalt Surfaces |
07/20/07 |
| 209931 |
163 |
98 |
Work Zone Delineation on Concrete Surfaces |
07/20/07 |
| 209940 |
84 |
111 |
Traffic Control for
Post Chip Seal Operations |
07/18/08 |
| 209960 |
191 |
148 |
Short Duration
Closure of Multi-Lane Divided Highway |
07/18/08 |
| 2010180 |
200 |
89 |
Longitudinal
Channelizer Detail |
01/18/08 |
| 2010190 |
394 |
70 |
Dropoffs In Work Zones |
11/27/06 |