Ecological/Permits

 

 

Home
Permits
Ecological

 


The Ecological/Permit Section has two functional work units. The ecological and permits units. The ecological unit's responsibilities primarily occur during the NEPA process, while the permit unit's responsibilities occur during the final design stages. The ecological and permits units often work closely together on projects, because ecological tasks often are pre-requisites to permitting tasks and go hand-in-hand.

 

The ecological unit deals with ecological assessment, impact prediction/analysis and processing of ecological documents, with resource agencies. Issues addressed within the ecological unit include, but are not limited to: ecological surveys, water quality, wetland delineation, stream assessment, sole source aquifers, source water protection for drinking water (includes wellhead protection), endangered species, farmland impact, scenic rivers and mitigation monitoring.

 

The permits unit deals with the completion, review, and processing of permits with various agencies, which are required by various state and federal laws and regulations (i.e. Clean Water Act, Isolated Wetland Law, etc.). These permits may include: USACE 404 individual permits, USACE 404 nationwide permits, USACE Section 10 permits, 401 water quality certifications, USCG Section 9 bridge permits, and Ohio EPA isolated wetland permits. Information regarding each of these work units is provide along with appropriate contact people for each area on the following pages for each work unit.

 

Both the ecological and permit units also work closely on projects in construction where resources within their areas of expertise are involved. For example, wetland mitigation may involve inspection at critical points during construction as well as permit mandated monitoring for up to five years of construction.

 

As would be expected from the broad range of topics dealt with in the ecological/permits section, members of the section have varied backgrounds and training. Formal education and training of the staff includes biology, botany, ecology, natural resources, geology, engineering, and landscape architecture. This broad educational background and the varied experience of the staff allows the section to deal with complex environmental and regulatory issues utilizing an inter-disciplinary approach.

 

When submitting reports please provide the following:

  • Ecological Survey Reports - varies according to type of report.

  • MOA coordination packages typically requires 3 copies submitted

  • ESR Level 1 and ESR level 2 Projects require 2 draft copies, 1 sent to OES & 1 sent to District for ODOT review, prior to submission of 6 final copies for coordination with the agencies.

  • Sole Source Aquifer - (2) copies

  • FPPA Screening Sheets (1) copy

  • Conceptual Wetland/Wetland Mitigation reports (5) to (6) copies

  • 404/401 Applications (9) copies

  • USACE Pre-Construction Notification (PCN) applications (4) copies

  • Ohio EPA Isolated Wetland Permit Pre-Activity Notification (PAN) (3) copies

 