There were no specification changes.
Because of the simplicity this item of work, no detailed explanation of the item is required in this manual.
1. Verify plan dimensions.
2. Verify materials.
3. State method of excavation (grader, milling machine, etc.)
4. Statement as to how excavated material is disposed
5. Construct the embankment and subgrade.
6. Areas graded to excess will be filled with 617 (Contractors’ expense)
7. Measure and pay per 209.08 (unless stated in plans there will be no deduction for intersections or gaps).
8. Check completed work.
9. Measure borrow, if required.
10. Measure pay according to 209.08 and 209.09, CA-EW-1 and 2
11. Document on the CA-EW-1, CA-EW-12 and CA-D
a. Do not duplicate the information on these forms unless necessary