construction | contracts | districts | engineering | financial | home | intranet | otis | policy | services |
|
|
"Old" Construction Documentation Forms - last updated: 07/25/07
New forms are in the New Manual!
The following forms are mostly excel files, but some are still pictures.
Download the files by right clicking on the file and selecting "Save Target As"
| Form Number | Title |
| AP-1 Color | All purpose grid form in red |
| AP-1 | All purpose grid form |
| BR2-75a | Pile Driving Log - Field Work Sheet |
| BR2-75b front | Pile Driving Log - Test Load front |
| BR-75b back | Pile Driving Log - Test Load back with explanation |
| C-135b front | Report on Compaction (nuclear density method using direct moisture and density readings) |
| C-135b back | Report on Compaction (curve set C) |
| C-135b metric front | Report on Compaction metric (nuclear density method using direct moisture and density readings) |
| C-135b metric back | Report on Compaction metric (curve set C) |
| C-145 | Rigid Pavement Daily Report |
| C-146 | Bituminous Concrete Inspection |
| C-147 | Liquid Bituminous Materials |
| C-147a | Random Selection of 448/848 Acceptance Samples |
| C-150 | Reinforcing Steel Verification Table |
| C-152 front | Report of Electrical Tests, Circuit Continuity Tests |
| C-152 back | Report of Electrical Tests |
| C-153 | Report of Electrical Tests, Signal Control System 10 day test |
| C-154 | Report of Electrical Tests, Ground Tests |
| C-155 | Report of Electrical Tests, Current and Voltage at Signs |
| C-156 | Daily Pavement Marking Report |
| C-156 supp 642 | Daily Pavement Marking Report, 642 Items |
| C-156 supp 644 | Daily Pavement Marking Report, 644 Items |
| C-157 | Report on Ground Mounted Signs |
| C-158 | Report on Sign Lighting |
| C-161 | Report on High Current Direct Current Test |
| C-163 front | Daily Report on Force Account Work |
| C-163 back | Daily Report on Force Account Work |
| C-163a | Daily Report on Force Account Work |
| C-167 | Proof Rolling |
| C-168 | Seeding |
| C-169 | Earthwork Calculations |
| C-170 front | Daily Pipe Construction Inspection Form |
| C-170 back | Daily Pipe Construction Inspection Form |
| C-19 | Proof Rolling |
| C-26 | General Field Calculation and Measurement |
| C-26s | General Field Calculation and Measurement, Sketch |
| C-27 | Seeding and Mulching, Area Calculations |
| C-28 | Seeding and Mulching, |
| C-35 | Pile Driving Field Measurement |
| C-46 | Daily Pavement Marking Report |
| C-85 | Final Acceptance |
| C-85 lpa | Final Acceptance, LPA projects |
| C-85 partial | Partial Acceptance |
| C-88 front | Report on Compaction |
| C-88 back | Report on Compaction (curve set C) |
| C-88 metric front | Report on Compaction, metric |
| C-88 metric back | Report on Compaction, metric (curve set C) |
| C-89 front | Report on Compaction (Cylinder density method) |
| C-89 back | Report on Compaction, (curve set C) |
| C-89 metric front | Report on Compaction, metric (Cylinder density method) |
| C-89 metric back | Report on Compaction, metric (curve set C) |
| C-90 front | Report on Compaction (Granular Material method) |
| C-90 back | Report on Compaction, (curve set C) |
| C-90 metric front | Report on Compaction, metric (Granular Material method) |
| C-90 metric back | Report on Compaction, (curve set C) |
| CMS-1 front | Inspectors Daily Report |
| CMS-1 back | Inspectors Daily Report |
| CMS-2 | PE/PS Daily Report |
| DLC-1 | Earthwork Daily Load Count |
| VPQ-1 | Validation of Final Pay Quantity |
| WP-1 | Pile Driving Summary |