I-70 Licking County
Bridge rehabilitation on I-70 approximately five miles east of the SR 13 interchange.
Two lanes of traffic will be maintained at all times in the westbound lanes. Two
lanes of traffic will be maintained in the eastbound lanes with the exception
of a 30-day period between April 15 and May 15, 2002, when one 12-foot lane of
traffic will be maintained.
Start: Spring 2002
Completion: Summer 2002
I-70 Franklin County
Night resurfacing on I-70 between James Rd. and the I-70/71 split.
Start: Spring 2000
Completion: Summer 2002
I-270
Franklin County
Night resurfacing and minor bridge repair from just north of I-70 to U.S. 33 on
the west side of the Columbus.
Start: Summer 2002
Completion: Fall 2002
I-270
Franklin County
Night resurfacing and minor bridge repair from I-70 to Alum Creek Drive on the
southeast side of Columbus.
Start: Summer 2002
Completion: Fall 2002
I-270
Franklin County
Pavement rehabilitation, sign replacement, and bridge repair on I-270 from Alum
Creek Drive to U.S. 23 on the southeast side of Columbus. Two lanes will be maintained
in each direction. Expect delays during peak travel times.
Start: Spring 2002
Completion: Fall 2003
I-670
Franklin County
Reconstruction from I-70 to Grandview Ave. on the west side of downtown Columbus.
Two lanes maintained in each direction. Both the Grandview Ave. bridge, between
I- 670 and McKinley Ave., and the Grandview Ave. ramps will be closed for six
months beginning this spring. Motorists will be directed to use the new ramps
at U.S. 33/SR 315, which will open in the spring.
Start: Spring 2002
Completion: Summer 2003
I-670
Franklin County
Complete reconstruction and expansion of I-670 from SR 315 to I-71.
I-670 will be permanently closed between Neil Ave. and Third St. Motorists coming
from the west can continue to exit at Neil Ave. and motorists coming from the
east can exit at Third St. Crosstown traffic will be detoured onto SR 315 to I-70
to I-71.
Start: Spring 2002
Completion: Fall 2003
I-670
Franklin County
Night resurfacing from Cleveland Ave. to I-71.
Start: Spring 2002
Completion: Summer 2002
I-70/71
Interstate Signs Franklin County
Night lane closures to replace deteriorated signs on I-70 between Rome- Hilliard
Rd. and on I-71 between I-70 and Fifth Ave.
Start: Spring 2002
Completion: Spring 2003